Labscand has carried out design work in the following sections:
Power supply (DGU) consisting of:
The scheme of the distribution part – 0.38 kV
Cable route from DGU to RU-0,4kV TP
DSU own needs system
Diesel fuel system
Gas-slag system
Environmental protection (CAB) consisting of:
Substantiation of the possibility of placing an autonomous power source and delivering equipment for emergency power supply to an industrial facility as part of a Labscand container power plant with a capacity of 1500 kVA based on a Mitsubishi engine.